sponsored links
Description
"Get a tool to analyze and exchange"
indir.biz Editor Estimates: the general market, sector or industry as equal any index
SMAP-2 to find the most appropriate timing performance estimates can be used for 1 / 3 of historical periods. For example, historical bid data entry entered as an equal period of 18 years, estimates are calculated for the next 6 years.
Annual return on the basis of decompounded, that is, for example, displays 20% annual return is calculated two-year period, 44% total
SMAP-2 mean the first series of a data tyx ^ ^ GSPC, ^ and ^ XAU IXBK
Historical data files publicly bid packages downloaded from the data source is a
given by the users of historical data period than a year now for SMAP 2 download free more than 40 years can be selected.
sponsored links
Visitor rates
4 Star
20
Member rates
4 Star
59
Ortalama oy:
3,8